CRITICAL PATH

MMSI 368217260Call sign WDM5580

6.5 km N of Hampton Roads Pt, United States

Live ·

37.0249° N, 76.3406° W

37.0249° N, 76.3406° W

Voyage

Speed
0.0 kn
Course
88°
Position
37.0249° N, 76.3406° W
Last report
21 Oct 2026, 12:08 UTC
Nearest port
Hampton Roads Pt6.5 km N of the port

Particulars

MMSI
368217260
Call sign
WDM5580
Type
Sailing vesselAIS type 36
Length
14 m
Beam
4 m

Not broadcast: destination, IMO number and draught.

About CRITICAL PATH

CRITICAL PATH (MMSI 368217260) is a sailing vessel registered in the United States. It is 14 m long and 4 m wide. Its most recent AIS position, received on 21 Oct 2026 at 12:08 UTC, placed it 6.5 km N of Hampton Roads Pt, United States.

Frequently asked questions

Where is CRITICAL PATH now?

CRITICAL PATH was last reported 6.5 km N of Hampton Roads Pt, United States on 21 Oct 2026 at 12:08 UTC.

What type of ship is CRITICAL PATH?

CRITICAL PATH is a sailing vessel. It is 14 m long and 4 m wide.

What is the MMSI number of CRITICAL PATH?

The MMSI of CRITICAL PATH is 368217260. Its call sign is WDM5580.

What flag does CRITICAL PATH fly?

CRITICAL PATH sails under the flag of the United States (US).

Vessels nearby

Other ships reported close to CRITICAL PATH in the last 24 hours.

Show 6 more

Other vessels named CRITICAL PATH

Ship names are not unique — check the MMSI or IMO to be sure you have the right one.

Similar sailing vessels

Active sailing vessels of a similar size (10–18 m).

All sailing vessels

Get alerts when CRITICAL PATH arrives in port

Follow CRITICAL PATH on the live map with a free account. Alerts on port calls, destination changes and AIS silence come with a fleet on any plan from €9.99/month.

Track CRITICAL PATH live — free