43.4326° N, 6.9180° E
43.4326° N, 6.9180° E
Voyage
- Speed
- 28.0 kn
- Course
- 232°
- Position
- 43.4326° N, 6.9180° E
- Last report
- 2 Sep 2026, 15:09 UTC
- Nearest port
- Boulouris-sur-Mer9.7 km E of the port
Particulars
- MMSI
- 232065011
- Call sign
- MTCY5
- Type
- Pleasure craftAIS type 37
- Length
- 12 m
- Beam
- 4 m
Not broadcast: destination, IMO number and draught.
About CHANGE ORDER
CHANGE ORDER (MMSI 232065011) is a pleasure craft registered in the United Kingdom. It is 12 m long and 4 m wide. Its most recent AIS position, received on 2 Sep 2026 at 15:09 UTC, placed it 9.7 km E of Boulouris-sur-Mer, France. It was moving at 28.0 knots on a course of 232°.
Frequently asked questions
Where is CHANGE ORDER now?
CHANGE ORDER was last reported 9.7 km E of Boulouris-sur-Mer, France on 2 Sep 2026 at 15:09 UTC. It was moving at 28.0 knots on a course of 232°.
What type of ship is CHANGE ORDER?
CHANGE ORDER is a pleasure craft. It is 12 m long and 4 m wide.
What is the MMSI number of CHANGE ORDER?
The MMSI of CHANGE ORDER is 232065011. Its call sign is MTCY5.
What flag does CHANGE ORDER fly?
CHANGE ORDER sails under the flag of the United Kingdom (GB).
Vessels nearby
Other ships reported close to CHANGE ORDER in the last 24 hours.
Other vessels named CHANGE ORDER
Ship names are not unique — check the MMSI or IMO to be sure you have the right one.
Similar yachts & pleasure craft
Active yachts & pleasure craft of a similar size (8–16 m).
Get alerts when CHANGE ORDER arrives in port
Follow CHANGE ORDER on the live map with a free account. Alerts on port calls, destination changes and AIS silence come with a fleet on any plan from €9.99/month.
