CHANGE ORDER

MMSI 338163602

17 km NE of Harwood, United States

Last seen

38.9626° N, 76.4835° W

38.9626° N, 76.4835° W

Voyage

Speed
0.0 kn
Course
116°
Position
38.9626° N, 76.4835° W
Last report
28 Sep 2026, 16:15 UTC
Nearest port
Harwood17 km NE of the port

Particulars

MMSI
338163602
Type
Pleasure craftAIS type 37
Length
13 m
Beam
4 m

Not broadcast: destination, call sign, IMO number and draught.

About CHANGE ORDER

CHANGE ORDER (MMSI 338163602) is a pleasure craft registered in the United States. It is 13 m long and 4 m wide. Its most recent AIS position, received on 28 Sep 2026 at 16:15 UTC, placed it 17 km NE of Harwood, United States.

Frequently asked questions

Where is CHANGE ORDER now?

CHANGE ORDER was last reported 17 km NE of Harwood, United States on 28 Sep 2026 at 16:15 UTC.

What type of ship is CHANGE ORDER?

CHANGE ORDER is a pleasure craft. It is 13 m long and 4 m wide.

What is the MMSI number of CHANGE ORDER?

The MMSI of CHANGE ORDER is 338163602.

What flag does CHANGE ORDER fly?

CHANGE ORDER sails under the flag of the United States (US).

Vessels nearby

Other ships reported close to CHANGE ORDER in the last 24 hours.

Show 6 more

Other vessels named CHANGE ORDER

Ship names are not unique — check the MMSI or IMO to be sure you have the right one.

Similar yachts & pleasure craft

Active yachts & pleasure craft of a similar size (9–17 m).

All yachts & pleasure craft

Get alerts when CHANGE ORDER arrives in port

Follow CHANGE ORDER on the live map with a free account. Alerts on port calls, destination changes and AIS silence come with a fleet on any plan from €9.99/month.

Track CHANGE ORDER live — free